Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)

Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)

CATEGORY GOLD CSCS
Duration – 700-1170 hours
Lectures – 261-544 Guided learning hours
Video Duration

GOLD CSCS card Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)

 

PRICE
Regular price – £1100 + vat.

ASSESSMENT

Evaluation

  • Evaluate via lessons
  • Evaluate via results of the final quiz – Get A Passing Grade
  • Evaluate via passed quizzes
  • Evaluate via questions
  • Evaluate via mark

The method of evaluating a student’s performance in a course.

Passing Grade(%)The conditions that must be achieved to finish the course.

https://youtube.com/shorts/7A8tfai9bE0?feature=share

Excerpt  Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)

OVERVIEW -The Level 3 NVQ Diploma in Insulation and Building Treatments (Construction) qualification provides a nationally recognised qualification for those working in this specialised area of construction.

Pathways:

  • Room in Roof
  • Park Homes
  • Hybrid Wall
  • Insulating Framed Sections of Buildings⁠
  • External Wall Insulation Boarder
  • External Wall Insulation Finisher
  • External Wall Insulation Boarder and Finisher
  • Internal Insulation (Walls)

This qualification is competence-based, candidates must demonstrate the advanced level of competence described in the units. Each candidate is required to produce a portfolio of evidence which demonstrates their achievement of all of the learning outcomes and assessment criteria for each unit.

Pathway 1 – Room in Roof
Pathway 2 – Park Homes

Pathway 3 – Hybrid Wall

Pathway 4 – Insulating Framed Sections of Buildings

Pathway 5 – External Wall Insulation Boarder

Pathway 6 – External Wall Insulation Finisher

Pathway 7 – External Wall Insulation Boarder and Finisher

Pathway 8 – Internal Insulation (Walls)
CURRICULUM –
Pathway 1 – Room in Roof
Candidates must complete:

  • All of the Mandatory units in this pathway
  • Plus TWO of the Additional Mandatory units
  • Plus ONE Optional unit from Group A
  • Plus ONE Optional unit from Group B

 Mandatory Units – ALL units required

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Insulation and building treatments buildin construction, defects and interfaces

Plus Additional Mandatory Units – TWO units required

  • Installing internal insulation to walls in the workplace
  • Installing insulation to frames sections of buildings in the workplace
  • Injecting, blowing or spraying insulation to framed sections of buildings in the workplace. Unit Endorsements: One of the following:
    • Injected
    • Blown
    • Sprayed

Plus Optional Units – ONE from GROUP A and ONE from GROUP B




GROUP A – ONE unit required

  • Installing insulation to cold roofs in the workplace. Unit Endorsements: One of the following:

    • Placed
    • Mechanically or adhesively fixed
  • Installing blow insulation to cold roofs in the workplace
  • Develop customer relationships

GROUP B – ONE unit required

  • Installing insulation to create warm roofs in the workplace. Unit Endorsements: One of the following:
    • Placed
    • Mechanically or adhesively fixed
  • Spraying insulation to create warm roofs in the workplace
  • Develop customer relationships

Develop customer relationships

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:

    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums

Pathway 2 – Park Homes

Candidates must complete:

  • All of the Mandatory units in this pathway
  • Plus ONE Additional Mandatory unit
  • Plus ONE Optional unit

Mandatory Units – ALL units required

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for a occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Installing external wall insulation in the workplace
  • Park homes insulation
  • Insulation and building treatments, building construction, defects and interfaces

Plus Additional Mandatory Unit – ONE unit required

    • Installing insulation to suspended floors in the workplace

 

    Spraying insulation to suspended floors in the workplace

Plus Optional Units – ONE unit required

  • Installing insulation to cold roofs in the workplace. Unit Endorsements: One of the following:
    • Placed
    • Mechanically or adhesively fixed
  • Installing blown insulation to cold roofs in the workplace
  • Develop customer relationships

Additional unit (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums

Pathway 3 – Hybrid Wall
Candidates must complete all of the Mandatory units in this pathway plus ONE Additional
Mandatory unit
Mandatory Units – ALL units required

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Installing external wall insulation in the workplace
  • Insulation and building treatments, building construction, defects and interfaces

Plus Additional Mandatory Unit – ONE unit required

  • Installing internal insulation to walls in the workplace
  • Injecting, blowing and spraying insulation to internal walls in the workplace. Unit Endorsements: Two of the following:
    • Injected
    • Blown
    • Sprayed

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
    • Dash finishes
    • Synthetic or non-synthetic renders
    • Proprietary pre-cast finishes
    • Paint finishes
    • Brick slips
    • Brick effect render
  • Develop customer relationships

Pathway 4 – Insulating Framed Sections of Buildings
Candidates must complete all of the Mandatory units in this pathway plus ONE Additional Mandatory unit
Mandatory Units – ALL units required

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Insulation and building treatments, building construction, defects and interfaces

Plus Additional Mandatory Units – ONE unit required

  • Installing insulation to framed sections of buildings in the workplace
  • Injecting, blowing or spraying insulation to framed sections of buildings in the workplace. Unit Endorsements: One of the following:
    • Injected
    • Blown
    • Sprayed

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships

Pathway 5 – External Wall Insulation Boarder
Candidates must complete all of the Mandatory units in this pathway
Mandatory Units – ALL units required

  • Conforming to general health, safety and welfare in the workplace
  • Confirming the occupational method of work in the workplace
  • Installing external wall insulation in the workplace
  • Insulation and building treatments, building construction, defects and interfaces

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums

Pathway 6 – External Wall Insulation Finisher
Candidates must complete all of the Mandatory units in this pathway plus ONE Additional Mandatory unit
Mandatory Units – ALL units required
 

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
    • Dash finishes
    • Synthetic or non-synthetic renders
    • Proprietary pre-cast finishes
    • Paint finishes
    • Brick slips
    • Brick effect render
  • Insulation and building treatments, building construction, defects and interfaces

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Dash finishes
    • Synthetic or non-synthetic renders
    • Proprietary pre-cast finishes
    • Paint finishes
    • Brick slips
    • Brick effect render
  • Develop customer relationships

Pathway 7 – External Wall Insulation Boarder and Finisher
Candidates must complete all of the Mandatory units in this pathway.

Mandatory Units

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Installing external wall insulation in the workplace
  • Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
    • Dash finishes
    • Synthetic or non-synthetic renders
    • Proprietary pre-cast finishes
    • Paint finishes
    • Brick slips
    • Brick effect render

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships

Pathway 8 – Internal Insulation (Walls)

Candidates must complete alll of the Mandatory units in this pathway plus ONE Additional Mandatory unit

Mandatory Units

  • Conforming to general health, safety and welfare in the workplace
  • Confirming work activities and resources for an occupational work area in the workplace
  • Developing and maintaining good occupational working relationships in the workplace
  • Confirming the occupational method of work in the workplace
  • Insulation and building treatments, building construction, defects and interfaces

Additional Mandatory Units – ONE unit required

  • Installing internal insulation to walls in the workplace
  • Injecting, blowing and spraying insulation to internal walls in the workplace. Unit Endorsements: One of the following:
    • Injected
    • Blown
    • Sprayed

Additional Units (not compulsory)

  • Develop customer relationships