Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)
Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)
CATEGORY – GOLD CSCS
Duration – 700-1170 hours
Lectures – 261-544 Guided learning hours
Video Duration –
GOLD CSCS card Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)
PRICE
Regular price – £1100 + vat.
ASSESSMENT
Evaluation
- Evaluate via lessons
- Evaluate via results of the final quiz – Get A Passing Grade
- Evaluate via passed quizzes
- Evaluate via questions
- Evaluate via mark
The method of evaluating a student’s performance in a course.
Passing Grade(%)The conditions that must be achieved to finish the course.
https://youtube.com/shorts/7A8tfai9bE0?feature=share
Excerpt – Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)
OVERVIEW -The Level 3 NVQ Diploma in Insulation and Building Treatments (Construction) qualification provides a nationally recognised qualification for those working in this specialised area of construction.
Pathways:
- Room in Roof
- Park Homes
- Hybrid Wall
- Insulating Framed Sections of Buildings
- External Wall Insulation Boarder
- External Wall Insulation Finisher
- External Wall Insulation Boarder and Finisher
- Internal Insulation (Walls)
This qualification is competence-based, candidates must demonstrate the advanced level of competence described in the units. Each candidate is required to produce a portfolio of evidence which demonstrates their achievement of all of the learning outcomes and assessment criteria for each unit.
Pathway 1 – Room in Roof
Pathway 2 – Park Homes
Pathway 3 – Hybrid Wall
Pathway 4 – Insulating Framed Sections of Buildings
Pathway 5 – External Wall Insulation Boarder
Pathway 6 – External Wall Insulation Finisher
Pathway 7 – External Wall Insulation Boarder and Finisher
Pathway 8 – Internal Insulation (Walls)
CURRICULUM –
Pathway 1 – Room in Roof
Candidates must complete:
- All of the Mandatory units in this pathway
- Plus TWO of the Additional Mandatory units
- Plus ONE Optional unit from Group A
- Plus ONE Optional unit from Group B
Mandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Insulation and building treatments buildin construction, defects and interfaces
Plus Additional Mandatory Units – TWO units required
- Installing internal insulation to walls in the workplace
- Installing insulation to frames sections of buildings in the workplace
- Injecting, blowing or spraying insulation to framed sections of buildings in the workplace. Unit Endorsements: One of the following:
- Injected
- Blown
- Sprayed
Plus Optional Units – ONE from GROUP A and ONE from GROUP B
GROUP A – ONE unit required
-
Installing insulation to cold roofs in the workplace. Unit Endorsements: One of the following:
- Placed
- Mechanically or adhesively fixed
- Installing blow insulation to cold roofs in the workplace
- Develop customer relationships
GROUP B – ONE unit required
- Installing insulation to create warm roofs in the workplace. Unit Endorsements: One of the following:
- Placed
- Mechanically or adhesively fixed
- Spraying insulation to create warm roofs in the workplace
- Develop customer relationships
Develop customer relationships
-
Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
Pathway 2 – Park Homes
Candidates must complete:
- All of the Mandatory units in this pathway
- Plus ONE Additional Mandatory unit
- Plus ONE Optional unit
Mandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for a occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Installing external wall insulation in the workplace
- Park homes insulation
- Insulation and building treatments, building construction, defects and interfaces
Plus Additional Mandatory Unit – ONE unit required
-
- Installing insulation to suspended floors in the workplace
- Spraying insulation to suspended floors in the workplace
Plus Optional Units – ONE unit required
- Installing insulation to cold roofs in the workplace. Unit Endorsements: One of the following:
- Placed
- Mechanically or adhesively fixed
- Installing blown insulation to cold roofs in the workplace
- Develop customer relationships
Additional unit (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
Pathway 3 – Hybrid Wall
Candidates must complete all of the Mandatory units in this pathway plus ONE Additional
Mandatory unit
Mandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Installing external wall insulation in the workplace
- Insulation and building treatments, building construction, defects and interfaces
Plus Additional Mandatory Unit – ONE unit required
- Installing internal insulation to walls in the workplace
- Injecting, blowing and spraying insulation to internal walls in the workplace. Unit Endorsements: Two of the following:
- Injected
- Blown
- Sprayed
Additional Units (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
- Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
- Dash finishes
- Synthetic or non-synthetic renders
- Proprietary pre-cast finishes
- Paint finishes
- Brick slips
- Brick effect render
- Develop customer relationships
Pathway 4 – Insulating Framed Sections of Buildings
Candidates must complete all of the Mandatory units in this pathway plus ONE Additional Mandatory unit
Mandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Insulation and building treatments, building construction, defects and interfaces
Plus Additional Mandatory Units – ONE unit required
- Installing insulation to framed sections of buildings in the workplace
- Injecting, blowing or spraying insulation to framed sections of buildings in the workplace. Unit Endorsements: One of the following:
- Injected
- Blown
- Sprayed
Additional Units (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
- Develop customer relationships
Pathway 5 – External Wall Insulation BoarderCandidates must complete all of the Mandatory units in this pathwayMandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming the occupational method of work in the workplace
- Installing external wall insulation in the workplace
- Insulation and building treatments, building construction, defects and interfaces
Additional Units (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
Pathway 6 – External Wall Insulation FinisherCandidates must complete all of the Mandatory units in this pathway plus ONE Additional Mandatory unitMandatory Units – ALL units required
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
- Dash finishes
- Synthetic or non-synthetic renders
- Proprietary pre-cast finishes
- Paint finishes
- Brick slips
- Brick effect render
Additional Units (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Dash finishes
- Synthetic or non-synthetic renders
- Proprietary pre-cast finishes
- Paint finishes
- Brick slips
- Brick effect render
- Develop customer relationships
Pathway 7 – External Wall Insulation Boarder and Finisher
Candidates must complete all of the Mandatory units in this pathway.
Mandatory Units
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Installing external wall insulation in the workplace
- Applying surface finishes to external wall insulation in the workplace. Unit Endorsements: Three of the following:
- Dash finishes
- Synthetic or non-synthetic renders
- Proprietary pre-cast finishes
- Paint finishes
- Brick slips
- Brick effect render
Additional Units (not compulsory)
- Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two or more of the following:
- Ladders/crawler boards
- Stepladders/platform steps
- Proprietary towers
- Trestle platforms
- Mobile scaffold towers
- Proprietary staging/podiums
- Develop customer relationships
Pathway 8 – Internal Insulation (Walls)
Candidates must complete alll of the Mandatory units in this pathway plus ONE Additional Mandatory unit
Mandatory Units
- Conforming to general health, safety and welfare in the workplace
- Confirming work activities and resources for an occupational work area in the workplace
- Developing and maintaining good occupational working relationships in the workplace
- Confirming the occupational method of work in the workplace
- Insulation and building treatments, building construction, defects and interfaces
Additional Mandatory Units – ONE unit required
- Installing internal insulation to walls in the workplace
- Injecting, blowing and spraying insulation to internal walls in the workplace. Unit Endorsements: One of the following:
- Injected
- Blown
- Sprayed
Additional Units (not compulsory)