Level 2 NVQ Diploma in Insulation and Building Treatments (Construction)

Level 2 NVQ Diploma in Insulation and Building Treatments (Construction)

CATEGORY – BLUE
Duration 480 – 680 hours
Lectures
Video Duration

Blue CSCS Card Level 2 NVQ Diploma in Insulation and Building Treatments (Construction)

Duration – up to 5 months

PRICE
Regular price – £750 + vat (£900)

ASSESSMENT
Evaluation
  • Evaluate via lessons
  • Evaluate via results of the final quiz – Get A Passing Grade
  • Evaluate via passed quizzes
  • Evaluate via questions
  • Evaluate via mark

The method of evaluating a student’s performance in a course.
Passing Grade(%)The conditions that must be achieved to finish the course.

Excerpt – Level: Intermediate (Level 2 for a Blue CSCS card)

OVERVIEW –
The Level 2 NVQ Diploma in Insulation and Building Treatments (Construction) qualification provides a nationally recognised qualification for those working in this specialised area of construction.

Pathway 1 – Wood Preserving and Damp-proofing
Pathway 2 – Wall Tie Replacement
Pathway 3 – Cavity Wall Insulation
Pathway 4 – Solid Floor Insulation
Pathway 5 – Under Floor Insulation
Pathway 6 – Cold Roof Insulation
This qualification is competence-based, candidates must demonstrate the level of competence described in the units. Assessment is the process of measuring a candidate’s skill, knowledge and understanding against the standards set in the qualification.

The qualifications must be assessed in a work environment and in accordance with the ConstructionSkills’ Consolidated Assessment Strategy for Construction and the Built Environment, and it must be internally assessed by an appropriately experienced and qualified assessor.

Each candidate is required to produce a portfolio of evidence which demonstrates their achievement of all of the learning outcomes and assessment criteria for each unit.

Evidence can include:
– Observation report by assessor
– Assignments/projects/reports
– Professional discussion
– Witness testimony
– Candidate product
– Worksheets
– Record of oral and written questioning
– Recognition of Prior Learning

CURRICULUM –
Pathway 1 – Wood Preserving and Damp-proofing. Candidates must complete all of the Mandatory units in this pathway.

Mandatory Unit – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Preparing structures for treatment in the workplace. Unit Endorsements One of the following endorsements required:
    • Wood preservation
    • Damp-proofing
    • Wall tie replacement
  • Applying preservation treatment in the workplace. Unit Endorsements. One of the following endorsements requirement:
    • Wood preservation
    • Wood preservation
  • Reinstating the structure after building treatments in the workplace
  • Insulation and building treatments, building construction, defects and interfaces
Additional Units (not compulsory)
  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements. Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships
Pathway 2 – Wall Tie Replacement. Candidates must complete all of the Mandatory units in this pathway.
Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Preparing structures for treatment in the workplace. Unit Endorsements.One of the following endorsements required:
    • Wood preservation
    • Damp-proofing
    • Wall tie replacement
  • Reinstating the structure after building treatments in the workplace
  • Installing wall ties in existing structures in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Driven systems
    • Grouted systems
    • Resin systems
    • Mechanical systems
  • Insulation and building treatments, building construction, defects and interfaces
Pathway 2 – Wall Tie Replacement. Candidates must complete all of the Mandatory units in this pathway.
Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Preparing structures for treatment in the workplace. Unit Endorsements.One of the following endorsements required:
    • Wood preservation
    • Damp-proofing
    • Wall tie replacement
  • Reinstating the structure after building treatments in the workplace
  • Installing wall ties in existing structures in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Driven systems
    • Grouted systems
    • Resin systems
    • Mechanical systems
  • Insulation and building treatments, building construction, defects and interfaces
Pathway 2 – Wall Tie Replacement. Candidates must complete all of the Mandatory units in this pathway.
Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Preparing structures for treatment in the workplace. Unit Endorsements.One of the following endorsements required:
    • Wood preservation
    • Damp-proofing
    • Wall tie replacement
  • Reinstating the structure after building treatments in the workplace
  • Installing wall ties in existing structures in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Driven systems
    • Grouted systems
    • Resin systems
    • Mechanical systems
  • Insulation and building treatments, building construction, defects and interfaces
Additional Units (not compulsory)
  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships
Pathway 3 – Cavity Wall Insulation. Candidates must complete all of the Mandatory units in this pathway. Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Installing cavity wall insulation in the workplace
  • Insulation and building treatments, building construction, defects and interfaces
Additional Units (not compulsory)
  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships
Pathway 4 – Solid Floor Insulation. Candidates must complete all of the Mandatory units in this pathway. Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Installing insulation to solid floors in the workplace
  • Insulation and building treatments, building construction, defects and interfaces
Additional Units (not compulsory)
  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships
Pathway 5 – Under Floor Insulation. Candidates must complete all of the Mandatory units in this pathway, plus ONE of the Additional Mandatory units. Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Insulation and building treatments, building construction, defects and interfaces
Additional Mandatory Units – ONE unit required
  • Installing insulation to suspended floors in the workplace
  • Spraying insulation to suspended floors in the workplace
Additional Units (not compulsory)
  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships
Pathway 6 – Cold Roof Insulation. Candidates must complete all of the Mandatory units in this pathway.
Mandatory Units – ALL units required
  • Conforming to general health, safety and welfare in the workplace
  • Conforming to productive working practices in the workplace
  • Moving, handling and storing resources in the workplace
  • Installing insulation to cold roofs in the workplace. Unit Endorsements: One of the following:
    • Placed
    • Mechanically or adhesively fixed
    • Insulation and building treatments, building construction, defects and interfaces

Additional Units (not compulsory)

  • Erecting and dismantling access/working platforms in the workplace. Unit Endorsements: Two of the following endorsements required:
    • Ladders/crawler boards
    • Stepladders/platform steps
    • Proprietary towers
    • Trestle platforms
    • Mobile scaffold towers
    • Proprietary staging/podiums
  • Develop customer relationships